Aquarius on the Beach Driveway

Project Name: Aquarius on the Beach Driveway
Completion Date: 29/11/2023
Scope of Works:

  • Pressure Washing and degreasing;
  • Concrete grinding of the existing surface;
  • Application of epoxy flooring system
  • Application of non-slip material;